1-3 October 2018
Physical Science building (PSB)
America/New_York timezone

BESSY VSR project overview

1 Oct 2018, 11:00
30m
401 (Physical Science building (PSB))

401

Physical Science building (PSB)

Cornell University Ithaca, NY 14853 United States

Speaker

Dr ADOLFO VELEZ (HZB G-ISRF)

Description

HZB is pursuing a superconducting upgrade of the BESSY II synchrotron ring in order to allow the machine to simultaneously store both long (15ps) and short (1.7ps) bunches. To achieve this goal higher harmonic cavities (1.5GHz and 1.75GHz) to the 500MHz normal conducting cavities operated in BESSY must be installed. In standard BESSY VSR operation a 300mA beam will be combined with a 20MV/m. Therefore the selection of the proper cavity technology and the implementation of high efficient HOM damping structures becomes a key aspect on the success of the project.

Primary author

Dr ADOLFO VELEZ (HZB G-ISRF)

Co-authors

Presentation Materials