HL-LHC DWQ HOM coupler design and SPS measurements

2 Oct 2018, 11:30
30m
401 (Physical Science building (PSB))

401

Physical Science building (PSB)

Cornell University Ithaca, NY 14853 United States

Speaker

Mr James Mitchell (CERN)

Description

The Double Quarter Wave (DQW) crab cavity will be installed as part of the High-Luminosity LHC (HL-LHC) upgrade. Proof-of-principle tests are currently on-going in CERN’s Super Proton Synchrotron (SPS). For the tests, the DQW has three on-cell coaxial HOM couplers per cavity. Currently, due to SPS space constraints, the HOM coupler is not optimal and a re-design is necessary for HL-LHC. This presentation outlines the coupler re-design, incorporating lessons learnt from manufacture, cold tests and tests in the SPS.